Packaging Guide
Install SchedPlus Packages
SchedPlus is available for Windows and Linux in several editions. Standard is recommended for most users.
All editions share the same scheduler and task data format. They differ in the interfaces included and how the application launches.
Choose an Edition
| Edition | Included interface | Best for |
|---|---|---|
| Standard | Advanced PyQt desktop and CLI | Most users |
| Lite | Lightweight Tkinter desktop | Simple task management |
| Full | Both desktop interfaces with a selector | Users who want both interfaces |
| CLI | Command-line interface only | Terminal-based workflows |
Download packages from the SchedPlus GitHub releases.
For direct-download packages, verify the file against its published SHA-256 checksum before installation.
Available Packages
| Platform | Edition | Format |
|---|---|---|
| Debian / Ubuntu | Standard | .deb |
| Debian / Ubuntu | Lite or CLI | .deb |
| Linux portable | Standard | AppImage |
| Windows | Standard | Per-user installer (.exe) |
| Windows portable | Standard, Lite, Full or CLI | ZIP |
| Microsoft Store | Standard | Store package |
| Snap Store | Standard | Strict-confinement Snap |
Debian and Ubuntu
Download the package matching your system's CPU architecture.
Install Standard:
sudo apt install ./schedplus_<version>_<architecture>.deb
Alternatively, install Lite or CLI:
# Lite
sudo apt install ./schedplus-lite_<version>_<architecture>.deb
# CLI
sudo apt install ./schedplus-cli_<version>_<architecture>.deb
Replace <version> and <architecture> with the values in the downloaded filename.
Switching Editions
The three Debian packages are mutually exclusive. Install only one at a time.
Standard already supports CLI commands, so a separate CLI package is unnecessary.
To switch editions, remove the installed package:
sudo apt remove schedplus
For other editions, replace schedplus with schedplus-lite or schedplus-cli.
Then install the replacement package.
Switching editions does not delete your saved tasks.
Linux AppImage
The Standard AppImage runs without installation.
Make the downloaded file executable, then launch it:
chmod +x SchedPlus-<version>-x86_64.AppImage
./SchedPlus-<version>-x86_64.AppImage
If your system does not support FUSE, extract and launch the AppImage manually:
./SchedPlus-<version>-x86_64.AppImage --appimage-extract
./squashfs-root/AppRun
The AppImage does not write application data into its own directory.
Windows
Standard Installer
Download and run:
SchedPlus-Setup-<version>-windows-x86_64.exe
The installer provides a per-user installation, Start Menu shortcuts and a standard uninstaller.
To remove SchedPlus, use Windows Settings → Installed apps.
Uninstalling the application does not remove your saved tasks.
The direct-download installer is currently unsigned and does not use SchedPlus's internal update system.
Portable ZIP
Portable packages are available for all four editions.
Download the appropriate archive:
SchedPlus-<Edition>-<version>-windows-x86_64.zip
Extract the ZIP and launch the included executable.
Portable packages do not require installation. You can move or delete the extracted application folder without deleting your tasks.
Windows portable releases use a managed current/ application directory with a separate updater. Supported updates replace the active version and perform a startup health check, restoring the previous working version if activation fails.
Microsoft Store
The Microsoft Store provides the Standard edition for Windows.
Install SchedPlus through the Store to receive Microsoft-managed installation and updates.
The Store edition does not use SchedPlus's internal updater.
Snap Store
The Standard edition is also available as a strict-confinement Snap.
Install it with:
snap install schedplus
Snap manages application updates through its own package system.
Installing from Source
For development or the Full source edition, clone the SchedPlus repository, create a Python virtual environment and install the Full dependencies using .[full].
See the SchedPlus repository README for current source installation instructions.
Updates
Update behaviour depends on the package format.
| Installation | Update method |
|---|---|
| Windows portable | Built-in external updater with rollback support |
| Windows direct installer | Download and install a new release manually |
| Debian | Verified package download, followed by manual installation |
| AppImage | Verified download, followed by normal platform installation |
| Microsoft Store | Microsoft Store updates |
| Snap | Snap-managed updates |
| Source installation | Update through the development workflow |
Update Verification
For supported internal updates, SchedPlus verifies:
- The Ed25519 signature of the update manifest
- The downloaded file's SHA-256 checksum
- The exact expected file size
- The matching edition, platform, architecture and package format
Stable and preview update feeds use separate signatures.
Debian and AppImage updates provide a verified download for installation through the operating system's normal tools. They do not silently replace installed packages.
Task Data and Upgrades
SchedPlus stores tasks in a local SQLite database, separate from its application files.
| Environment | Database location |
|---|---|
| Windows installer, portable and Store | %APPDATA%\ZFordDev\SchedPlus\tasks.db |
| Debian and AppImage | ~/.local/share/ZFordDev/SchedPlus/tasks.db |
| Strict Snap | $SNAP_USER_COMMON/SchedPlus/tasks.db |
These locations are retained across normal application upgrades.
Uninstalling SchedPlus does not automatically delete the database.
Before a Major Upgrade
Close SchedPlus and make a backup of tasks.db before upgrading between major versions.
You can also use the application's built-in backup feature.
Migrating Older Installations
Releases through v0.7.3 may have stored their database inside the application directory.
SchedPlus automatically relocates these databases to the appropriate user data directory when possible.
If a database schema upgrade is required, SchedPlus creates a backup before applying changes.
Migration backups use filenames similar to:
tasks_pre_migration_v<old>_to_v<new>_*.db
If migration fails, the database changes are rolled back.
If an older version cannot read a newer database schema, SchedPlus refuses to modify that database rather than risk damaging existing task data.
Licensing and Source Code
The distributed SchedPlus desktop application is licensed under GPL-3.0-only.
The reusable scheduler, validation, task model and storage modules in src/logic are additionally available under Apache-2.0.
Binary packages include their applicable licence and NOTICE files.
Source code and release tags are available from the SchedPlus GitHub repository.
The historical MIT licence notice is retained for releases through v0.7.3. See the repository's NOTICE file for the licensing boundary.